Phone (08) 9202 4666    Login Authorised Login

La Cappannina Restaurant (Current)

March 12, 2018 6:18 am

La Cappannina Restaurant is located in Scarborough next to the new swimming pool facility.

MPS has been engaged to supply mechanical services.

Bannister Downs Dairy

November 14, 2017 6:24 am

Bannister Downs Dairy is located in the south-west region of Western Australia in the town of Northcliffe.

MPM were engaged to design and construct the mechanical services.

Royal Perth Hospital (Current)

March 12, 2018 5:56 am

The Royal Perth Hospital is located in Wellington Street, Perth.

MPS were engaged to decommission and remove existing generator systems and replace with new.

Hocart Lodge

November 14, 2017 6:04 am

Hocart Lodge is a residential aged care facility located in Harvey in the south-west region of Western Australia.

MPM were contacted to supply the mechanical services.

Djidi Djidi Primary School

March 12, 2018 6:31 am

The Djidi Djidi Primary School is located in Glen Iris in the south-west of Western Australia.

MPS was been engaged to supply mechanical services.

Trinity Village Shopping Centre

January 9, 2018 1:54 am

The Trinity Village Shopping Centre is located on the corner of Marmion Ave and Santorini Promenade, Alkimos and includes a Coles supermarket, specialty shops, medical centre, recreation centre and fast food outlets.

MPM were engaged to supply and install the mechanical services.

Carousel Cannington (Current)

June 14, 2017 3:26 am

The Carousel Shopping Centre is located in Cannington on Albany Highway.

MPM have been contracted to design, supply and install mechanical services.

480 Hay Street, Perth (Current)

June 14, 2017 2:50 am

MPM have commenced construction works on 480 Hay Street, which will house the 26 storey Westin Hotel, Perth.

MPM have been engaged on a design and construct basis to provide the mechanical services.

Westpac Fitout – BP Tower 2

November 15, 2017 2:59 am

The Westpac Office is located in Brookfield Place, Tower 2 on levels 2,3 & 4 in the Perth CBD.

MPS were engaged to supply the mechanical services which included GreenStar and WELL requirements.

Next DC Data Centre – DH 3 & 4 Fitout

November 15, 2017 2:22 am

The Next DC Data Centre is located in Malaga. 

MPS was engaged to supply and install mechanical services to the Data Halls 3 & 4

Capital Square Podium and Carpark

June 14, 2017 2:26 am

Capital Square Podium and carpark are located on the Old Emu Brewery site on Mounts Bay Road, Perth. MPM were contracted to supply and install mechanical services. The project targeted a 5 star Green Star design and 5 star NABERS energy rating.

Shire of Ashburton Office

March 12, 2018 6:26 am

The Shire of Ashburton Office is located in Onslow, Western Australia.

MPS has been engaged to supply mechanical services.

Town of Victoria Park – Administration Building

November 14, 2017 7:22 am

The Town of Victoria Park Administration Building is located on Shepperton Road and is made up of two floors and a roof top plant deck.

MPS were engaged to carryout the mechanical services.

Singleton Village Shopping Centre

October 11, 2017 6:34 am

The Singleton Village shopping Centre is located on Mandurah Road, Karnup and includes a Woolworths supermarket, specialty shops, medical centre, service station and fast food outlets.

MPM were contracted to supply and install mechanical services.

Town of Victoria Park – Library

November 15, 2017 1:23 am

The Town of Victoria Park Library is located in Sussex Street, Victoria Park.

MPS was engaged as Head Contractor to carry out the mechanical services.

Seacrest Shopping Centre

October 19, 2017 5:03 am

The Seacrest Shopping Centre is located on the corner of Iduna Road and Barrett Drive, Seacrest and features a 3200 metre square Woolworths Supermarket and 1800 square metres of specialty shops.

Lakelands Shopping Centre

October 19, 2017 5:35 am

The Lakelands Shopping Centre is located 65km south of Perth CBD, close to Mandurah and includes a 5000 square metre Coles Supermarket, K Mart, library, childcare and more than 40 specialty shops.

MPM were engaged to supply and install the mechanical services.

Optus Stadium

June 14, 2017 3:38 am

The Optus Stadium is a multipurpose stadium located on Victoria Park Drive, Burswood.

MPM were contracted to supply and install the airside services.

Station Street, Subiaco

June 14, 2017 3:51 am

This development on the corner of Hood & Station Streets, Subiaco includes a Coles, Target, retail tenancies, food and beverage outlets, office space and parking.

MPM were contracted to supply and install mechanical services.

Department of Immigration & Border Protection

October 10, 2016 5:22 am

The DIBP Offices are located at Perth International Airport, Terminal 1 Departures. The scope of work involved the expansion of an existing CCTV server room.

State Administration Tribunal

May 31, 2016 1:03 am

The State Administration Tribunal is located on Hay Street, Perth. MPM were contracted to carry out fitout to 11 storeys of the building which included upgrading the main plant with supplementary chillers and associated works.

Queens 1 Riverside Apartments

May 30, 2016 9:00 am

The Queens 1 Riverside Apartments are located on Hay Street, East Perth. MPM were contracted to supply and install the mechanical services.

West Kimberley Regional Prison

August 8, 2014 5:18 am

West Kimberley Regional Prison comprises of numerous administrative and recreational buildings and 22 accommodation units.

Four Points by Sheraton Hotel

June 1, 2016 1:45 am

Four Points by Sheraton Hotel is located on Wellington Street, Perth.

MPS supplied and installed mechanical services, whilst the Hotel remained fully occupied with minimal disruption to guests and staff.

Warnbro Shopping Centre

May 31, 2016 5:49 am

The Warnbro Shopping Centre is located on Warnbro Sound Avenue, Warnbro.
The project involved the extension of the existing shopping centre, comprising of an additional 27 tenancies, 4 kiosks in the new mall and a Big W store.

BHP Mooka

April 6, 2016 6:09 am

The facility consists of a state of the art fully automated workshop and warehouse including multi-level office, for the maintenance and repairs of BHP’s Ore Car Fleet.

Mandoon Estate Winery

February 27, 2015 1:01 am

The Mandoon Estate Winery project is located at Lots 10 & 215 Harris Road, Caversham.

MPM was engaged to provide mechanical services consisting of airconditioning, local and general mechanical ventilation systems.

Rendezvous Hotel

February 26, 2015 3:06 am

The Rendezvous Hotel is located at The Esplanade, Scarborough, Western Australia.
MPM carried out the design and construct requirements of the mechanical services installation comprising the complete design, manufacture, supply, delivery and installation on site of air conditioning and mechanical services plant.

Acacia Prison Extension

February 26, 2015 2:29 am

Acacia Prison is located in Great Eastern Highway, Wooroloo. The prison complex comprises of numerous administrative, educational, health, recreational and accommodation buildings.

Fiona Stanley Hospital – Mental Health Facility

October 6, 2014 5:08 am

MPM installed and commissioned the following HVAC systems:

Roy Hill Iron Ore On-site Facilities

October 5, 2014 6:44 am

Located approximately 150km North West from the Newman town site, Roy Hill is Hancock Prospecting flagship iron ore mine. With on site infrastructre to cater for 2500 workers the site comprises of Administration Facilities, Dry Mess, Wet Mess and Auditorium.

ONE30 Stirling Street

September 13, 2014 12:22 pm

ONE30 Stirling Street incorporates four floors of commercial office space, four levels of car parking (500 carbays) and three ground floor retail tenancies.

Rio Tinto Operations Centre

July 17, 2014 5:51 am

The centre comprises of a 4000 metre square operations floor, two 600 metre square data centres, IT facility, meeting and conference facilities.

16 St. George’s Terrace

June 1, 2016 2:00 am

16 St. George’s Terrace is located in the Perth CBD.

MPS were engaged to supply and install mechanical services, in a fully occupied building.

St. John of God – Midland Health Campus

May 31, 2016 6:24 am

The St. John of God Hospital is located in Clayton Street, Midland. MPM were engaged to project manage, supervise, manufacture, supply and install all ductwork required for the mechanical services scope of works.

Kings Square 1

February 26, 2015 3:52 am

Kings Square 1 is located within the Perth City Link precinct, on the corner of Kings & Wellington Streets. MPM are currently completing mechanical services works which will achieve a 5 star Green Star rating and a 5 star NABERS rating.

Brookfield Place Tower 2

April 6, 2016 4:43 am

Brookfield Place Tower 2 is a commercial development in the Perth CBD and forms part of Brookfield Place. The tower is 16 levels with “Premium Grade” PCA commercial accommodation – typical floor plates 2,100 square metres with approximately 34,000 square metres of lettable area.

Busselton Health Campus

May 31, 2016 2:28 am

The Busselton Health Campus is located on Mill Road, Busselton overlooking Geographe Bay. The campus includes 64 overnight and 20 same day beds, rental unit, two theatres, procedures room and an expanded emergency unit.

Baldivis Shopping Centre

May 30, 2016 8:24 am

The Baldivis Shopping Centre is located on Safety Bay Road, Baldivis. MPM were contracted on a design and construct basis to supply and install the mechanical services.

Arctick Authorisation Number
AU05793
WA Electrical Contractors License Number: EC011858
QLD Electrical Contractor Licence: 83717
QBCC Trade Contractors Licence: 15080571